We provide specialist asbestos floor tile removal across Surrey and the South East, helping homeowners, landlords, schools, and businesses eliminate asbestos safely and effectively. Our process is designed to be compliant, affordable, and stress-free, so you can carry out your renovation or refurbishment with complete confidence.
Fires can leave hidden dangers behind, especially when asbestos cement materials are involved. Following a fire, damaged roofing and debris can become fragmented, increasing the risk of fibre release if not handled correctly. For this project in Charlton, our team was called in to safely collect and dispose of asbestos-containing materials from two fire-damaged garages.
Understanding the Project
The fire had left the asbestos cement roofing and surrounding debris fragmented and unstable. Asbestos cement is generally considered a lower-risk material, but damage from fire or impact can cause it to break apart, increasing the chance of fibres being released into the air. Careful, controlled handling was essential to prevent contamination and to leave the site safe for the next stage of recovery.
Our Approach and the Work We Carried Out
The works were completed under Non-Licensed Notifiable Work (NNLW) procedures, in line with strict UK asbestos regulations. Our approach followed a clear sequence to keep fibre release to an absolute minimum:
- Controlled Wetting – we used controlled wetting techniques throughout the works to suppress dust and reduce the risk of fibre release.
- Full PPE and RPE – our operatives wore full PPE and suitable RPE throughout the works.
- Careful Hand Collection – all asbestos cement fragments and contaminated debris were carefully collected by hand.
- Double-Bagging and Labelling – every piece of asbestos waste was double-bagged or wrapped and correctly labelled.
- Decontamination – the work area was thoroughly decontaminated on completion.
- Licensed Disposal – waste was transported by a registered hazardous waste carrier to a licensed disposal facility, with hazardous waste consignment notes issued.
Final Outcome
Fire-damaged asbestos requires specialist handling, even when the material itself is asbestos cement. By following the correct procedures at every stage, our team was able to leave the site safe, clean, and ready for the next phase of recovery.
Contact Us for Safe Asbestos Removal in Charlton
If you have a fire-damaged garage, shed or outbuilding containing asbestos, don’t take any risks. Get in touch with our team for professional advice and a compliant solution tailored to your situation.